
Service Repair
Our highly skilled technicians ensuring your equipment operates efficiently and safely.
Your electrical panel is the heart of your home’s power — and the 100-amp panels installed in most Orange County homes between the 1960s and the 1980s were never designed for an EV charger, a heat pump, an induction range or an ADU. Smartchoice Air Conditioning, Heating & Electrical provides safe, code-compliant electrical panel upgrades across Orange County: 100-amp to 200-amp service upgrades, 400-amp service for larger homes, sub-panels, and electrical panel replacement for recalled Federal Pacific and Zinsco panels. As licensed C-10 electricians (CSLB #1120145) we pull the permit, coordinate the shutoff and meter release with Southern California Edison, and pass the city inspection — start to finish, usually in one day. For the rest of our electrical work and prices, see our Orange County electrician page.
Why Choose Smartchoice for Your Panel Upgrade?
- Licensed & permit-handled: C-10 electricians who file the permit, coordinate the meter shutoff with Southern California Edison, and pass inspection for you.
- Right-sized for your home: we calculate your real electrical load so your new panel — 200A for most homes, 400A where it’s warranted — fits your needs today and leaves room to grow.
- Safety & code first: every install meets current NEC and Orange County code — no shortcuts on the equipment that protects your home from electrical fire.
- Clean, guaranteed work: tidy, clearly labeled Siemens panels backed by a one-year labor warranty.
- Both trades under one roof: if the upgrade is for a heat pump or EV charger, the same company sizes the panel and installs the equipment — one crew, one permit, one schedule.
Our Electrical Panel Services
- 200-amp panel upgrades: replace a 100-amp panel or fuse box with a modern 200-amp service — the standard for an Orange County home today.
- 400-amp service: for large homes, homes with an ADU, or households running two EV chargers, a heat pump and a pool or spa together.
- Sub-panel installation: add capacity for a garage, workshop, ADU, or a dedicated EV-charger circuit without replacing the main panel.
- Federal Pacific, Zinsco and Sylvania replacement: swap out the recalled and insurance-flagged panels common in 1960s–80s tract homes.
- Panel repairs: failing breakers, double-tapped breakers, corroded bus bars, and meter-main problems.
200-Amp Panel Upgrade Cost in Orange County
Most 200-amp panel upgrades with Smartchoice cost $4,500 to $5,000. That price includes the new Siemens panel, grounding and bonding to current code, the permit and inspection, and clear labeling of every circuit, plus a one-year labor warranty. What moves the number: relocating the meter or main, a 400-amp service, adding a sub-panel, or a home where Southern California Edison requires the overhead riser or underground service conductors to be replaced — that utility-side work is quoted separately once SCE has looked at the service. We give you a flat written price after a free on-site assessment; there’s no charge to find out what you need.
For what is in that price and what adds to it, see our electrical panel upgrade cost guide.
Get a Call Back Today
Tell us what's going on. We call you back the same business day with a time and a flat price before any work.
SCE Charge Ready Home
Smartchoice is a participating contractor in Southern California Edison’s Charge Ready Home program, which helps eligible SCE customers with the electrical work for a home EV charger, including a panel upgrade. SCE decides who qualifies and what the program covers. See SCE’s eligibility page and SCE’s guide to applying. If SCE prequalifies you, give us your prequalification ID and we’ll handle the permit, the installation and the paperwork. For the charger itself, see our EV charger installation page. Other EV charger rebates are on our rebates page.
When a 200-Amp Upgrade Is Worth It
If you’re adding any one of these, almost certainly: a Level 2 EV charger (40–60 amps), a heat pump (30–60 amps), an induction range, an electric dryer or water heater, an ADU, or home battery storage. Most 100-amp panels in 1970s–80s homes in Yorba Linda, Anaheim Hills, Fullerton and Placentia are already near their limit with the original loads. A 200-amp service gives you headroom for the next twenty years, and it’s the first thing an inspector, insurer or buyer looks at. If you’re planning two EVs plus a heat pump plus an ADU, that’s when we talk about 400 amps.
The “80% Rule” for Electrical Panels
Electrical code treats anything that runs for three hours or more — an EV charger, a heat pump, a pool pump — as a continuous load, and a continuous load may only use 80% of its circuit’s rating. So a 48-amp EV charger needs a 60-amp breaker, and a panel’s total continuous loads can’t exceed 80% of its main breaker. This is why a 100-amp panel that “has open slots” still can’t take an EV charger: the slots aren’t the limit, the capacity is. Our load calculation applies this rule to your actual appliances before we recommend a panel size.
Federal Pacific and Zinsco Panel Replacement
Federal Pacific (Stab-Lok), Zinsco and some Sylvania panels have documented failure rates — breakers that don’t trip under fault — and they are common in Orange County homes built from the 1960s through the early 1980s. Many California insurers now decline new policies, or non-renew existing ones, on homes with these panels, and buyers’ inspectors flag them every time. If you have one, a panel replacement has stopped being an upgrade and become a requirement — and it’s the same one-day job as a 200-amp upgrade, at the same price.
Condo and HOA panel replacement. In a condo or townhome, a panel replacement usually needs your HOA’s approval before the work starts. We help with the HOA application and do the work under our C-10 license with the permit and inspection. See condo and townhome upgrades.

What Happens on Install Day
We coordinate the shutoff with Southern California Edison in advance. On the day, power is off for roughly four to eight hours while the old panel comes out and the new one goes in, grounding and bonding are brought to code, and every circuit is labeled. You have power back the same day, as soon as the installation is complete. The city inspection and SCE’s formal meter release follow within a couple of days — we schedule both and meet the inspector, so there’s nothing for you to chase. One day on site for a standard 200-amp upgrade; longer only if the service entrance or meter is being relocated. For unplanned outages, see how power outages affect your HVAC system.
One note on tax credits: the federal 25C credit that covered panel upgrades (up to $600) ended for installations after December 31, 2025. For EV-related upgrades, ask about SCE’s Charge Ready Home program above. Financing is available on approved credit.
Electrical Panel Upgrade FAQs
How much does it cost to upgrade to a 200-amp panel in Orange County?
Most 200-amp upgrades with Smartchoice run $4,500 to $5,000, including the new Siemens panel, grounding and bonding, permit and inspection, and circuit labeling, with a one-year labor warranty. Relocating the meter, going to 400 amps or adding a sub-panel costs more; utility-side work like replacing the riser or service conductors is quoted separately once SCE has assessed it. The on-site assessment and written quote are free.
Can I get my panel upgrade covered by SCE’s Charge Ready Home program?
It can, if you’re an eligible SCE customer and the upgrade is for a home EV charger. Smartchoice is a participating contractor. SCE decides who qualifies and what the program covers, so check SCE’s eligibility page for the current terms. If SCE prequalifies you, give us your prequalification ID and we’ll handle the permit, the installation and the paperwork.
Is it worth upgrading to 200-amp service?
If you’re adding an EV charger, heat pump, induction range, ADU or battery storage, yes — a 100-amp panel in a 1970s–80s Orange County home is usually already near its limit. A 200-amp service covers all of those with room to spare, and it’s what inspectors, insurers and buyers expect to see. If the only change is a like-for-like appliance swap and your panel is healthy, we’ll tell you an upgrade can wait.
Do you install 400-amp panels?
Yes. A 400-amp service makes sense for large homes and for households stacking several big loads — two EV chargers, a heat pump, a pool or spa, and an ADU on the same service. It involves a larger meter-main and coordination with Southern California Edison on the service conductors, so it’s a bigger job than a 200-amp upgrade; we scope it with a full load calculation and give you a flat price before any work starts.
What is the “80% rule” for electrical panels?
Electrical code limits continuous loads — anything that runs three hours or more, like an EV charger or heat pump — to 80% of the circuit and panel rating. A 48-amp charger needs a 60-amp breaker; a 100-amp panel can’t carry an EV charger on top of normal household loads even with open breaker slots. Our load calculation applies the rule to your actual appliances before we recommend a panel size.
Do I need a permit to upgrade to 200-amp service?
Yes — every Orange County city requires a permit and inspection for panel work, and Southern California Edison has to disconnect and reconnect the service. We pull the permit, schedule the inspection, coordinate the meter release with SCE, and include it all in the price. An unpermitted panel is a problem at resale and can void an insurance claim after a fire.
How long does a panel upgrade take, and will my power be off?
A standard 200-amp upgrade is one day on site. Power is off for roughly four to eight hours while the panel is replaced, grounding and bonding are brought to code, and circuits are labeled — and it’s back on the same day, as soon as the installation is complete. The city inspection and SCE’s formal meter release follow within a couple of days; we schedule both. Relocating the meter or service entrance adds time, and we’ll tell you up front if that applies.
Will a panel upgrade let me add an EV charger or heat pump?
That’s usually the reason for the upgrade, and yes. A 200-amp panel has the capacity for a Level 2 charger (40–60 amps) and a heat pump (30–60 amps) alongside normal household loads. Because we hold both the electrical and HVAC licenses, we can install the EV charger or heat pump with the panel — one crew, one permit, one inspection.
Ready to modernize your power? Call (949) 229-6766 or schedule your electrical panel estimate with our licensed Orange County electricians.
Our Electrical Panel Services
Smartchoice Air Conditioning, Heating & Electrical offers comprehensive electrical panel installation services, including:
Panel Upgrades
Upgrading outdated electrical panels to accommodate increased electrical loads.
New Installations
Installing new electrical panels for new constructions or renovations.
Service Panel Inspections
Assessing the condition of existing electrical panels and recommending upgrades.
Code Compliance
Ensuring all installations comply with local electrical codes and regulations.
Why Choose Smartchoice HVAC & Electrical?
Choose Smartchoice Air Conditioning, Heating & Electrical for your electrical panel upgrade because:
Expertise
Our licensed C-10 electricians have been upgrading Orange County panels since the business started in 2017 — 100A to 200A, 400A services and sub-panels — with precision and full code compliance.
Quality
We install Siemens panels and breakers, grounded and bonded to current code, for durability and safe performance.
Workmanship Guaranteed
We stand behind our work with a guarantee of quality craftsmanship.
Customer Satisfaction
We prioritize your satisfaction with clear communication, timely service, and meticulous attention to detail.
What Our Customers Say
Real reviews from homeowners we’ve helped.
Contact Us for an Electrical Panel Upgrade
Leave your number and we'll call you back the same business day, or call us now. A real person answers.
- Same-day service when you call by noon
- Flat price before any work
- Licensed C-20 HVAC + C-10 Electrical
Get a Call Back Today
Name, phone and ZIP. That's it.